Library Construction Update

The library is in the process of replacing the fire sprinkler system in the entire building. This critical project started in the summer and will continue through winter break. Study spaces and collections will be temporarily unavailable to the public during construction phases.
 
Currently, work is being done on the east side of the second floor. In particular, general collection A-K, government documents and media scores are not available for browsing. Library staff will pull requested items on a limited schedule, so be prepared for delays in obtaining materials. Students can use the request button in the library catalog, or ask at the Library Service Desk, to request materials. Library staff also strongly encourage the use of e-resources, MOBIUS and interlibrary loan for access to materials during this project.
 
Starting the week of Sept. 10, work will move to the media library and the east side of second floor will once again be open to the public. For a more detailed schedule, see the project website.
 
For questions, or help accessing library materials, stop by the Library Service Desk, or call at 660.785.4051 or 660.785.4533.

stocklibrary618.jpg
Previous Next