Central Steam System Shutdown
This year’s annual steam system shut-down for maintenance and inspection is scheduled for May 14-16.
The steam system will be shut down May 14. Except for buildings with their own boilers*, the campus will be without steam for building heat and hot water throughout the shutdown period. The steam system should be back on-line by the evening of May 16.
*Buildings with boilers: Barnett Hall, Campbell Apartments, Ryle Hall, Student Recreation Center and West Campus Suites.
The steam system will be shut down May 14. Except for buildings with their own boilers*, the campus will be without steam for building heat and hot water throughout the shutdown period. The steam system should be back on-line by the evening of May 16.
*Buildings with boilers: Barnett Hall, Campbell Apartments, Ryle Hall, Student Recreation Center and West Campus Suites.