Portion of Parking Lot Closed During SUB Renovation

Spaces in the parking lot north of the Student Union Building (SUB) are now closed to allow for equipment to perform renovations on the Student Union Building.

This will be ongoing throughout the semester of the during the SUB renovations.

The row north of the SUB will be barricaded for construction work. Handicapped parking will still be available. Parking in this lot could be hazardous due to the construction equipment.
Previous Next